Capillary Tee

Capillary-Concrete-Tee

The construction method here involves a plastic liner below, Capillary Concrete layer and then USGA greens mix at 6 inches.
Below pictures from the construction of the tees

IMG_3872-e1421159661984

bild-2

 

Ready to play.

Tee att redigera 4

These tees have received zero irrigation this year, compared to our other tees that have received
in excess of 200 mm irrigation.

The Tee below is in the same area which has received zero irrigation, but built the industry standard way.

Compare these two Tees!

IMG_1788

 

See the film about how it was done at Desert Hills Golf Course, Scottsdale AZ, USA

 

Comments are closed